Bathroom renovation hidden drawer storage: the 75% tile wall
A $21,000 bathroom gut job shows why hidden drawer storage has to be planned before waterproofing and tiling, with the spots that work and the mistakes that cost.

Bathroom renovation hidden drawer storage is a first-fix decision. The drawer carcass has to sit around the waste pipe, the studs and the door swing, so it belongs on the plan before the waterproofing goes down. The useful locations are a pull-out plinth under the vanity, a slim drawer bank beside the basin, and a recessed drawer set between studs in a dry wall. None of them work if you cut the opening after the tiles are fixed.
What the $21,000 gut job changed
Lesley Lorimer's family moved into a bungalow in 2015 with brown tiles covering 75% of the bathroom walls. They painted the tiles and tub with white acrylic in 2019. The paint later cracked and peeled, which pushed them into a full gut. The finished job came in at a $21,000 budget and included a tub-to-shower swap, new white tiles chosen for a long shelf life, and black fittings. Their contractor was Keilan Cook. The useful part for anyone planning storage is the order of work: the room was stripped, the services were exposed, and the new layout went in before the finish. A hidden drawer is a layout item. It needs the same treatment as the shower valve or the waste pipe.
If you are retrofitting a drawer into a finished bathroom, you are working around the tile, the tanking and the pipework. That is why the cheap-looking option, a plinth drawer under a vanity, is often the one that gets built. It can be added to the vanity carcass without opening the wall, and it uses space that most bathrooms waste. The wall-recessed drawer is the neater result, and it is the one to decide before the first fix.
Where hidden drawer storage fits
The vanity plinth drawer is a shallow box in the kickboard, usually 100mm to 150mm deep. It suits spare toilet rolls, cleaning cloths and flat bottles. The catch is the waste trap and the water supplies. Fit an isolation valve where you can reach it, and leave the trap removable. A plinth drawer that blocks the trap turns a five-minute repair into a dismantling job.
A dry stud wall can take a framed drawer between two studs. The drawer box needs its full depth, plus the runner, plus the tile and adhesive on the face. Check for cables and pipes before you cut. A socket, a light or a shaver point in that wall makes the job an electrician's first, because bathroom electrical zones have rules and the cable cannot be buried where a drawer screw will find it.
If the room has 200mm to 300mm of dead space beside the vanity, a tall bank of slim drawers gives more storage than a deeper single drawer. Build it as a separate carcass and scribe it to the wall. Keep the drawer fronts clear of the door swing and the shower screen. In a small room, the door swing kills more storage plans than the pipework. I'd pick the plinth drawer first if the wall is already tiled and the budget is tight.
Measurements and sequencing
Measure the drawer box before you frame the opening. The opening is the box plus runner clearance plus the thickness of the tile, adhesive and any trim. Add space behind the box for the waste pipe, the water supply and the isolation valve. If the drawer is going into a wall, use a stud finder and check both sides of the wall. A pipe or cable behind a stud bay is common in older bathrooms. The drawer has to slide without touching anything, and you need to be able to lift it out for cleaning. Sequence it like this: first fix, framing, waterproofing, tiling, then drawer. If the drawer opening sits in a wet zone, tank the opening before the tiles go on and seal the cut edges. A hidden drawer in a shower wall is possible, but it is a waterproofing detail first and a storage detail second.
- Time:
- Half a day for one vanity plinth drawer if the carcass is open. A wall-recessed drawer takes longer because the opening has to be framed, tanked and tiled.
- Difficulty:
- Moderate. The carpentry is straightforward; the sequencing and waterproofing are where it goes wrong.
- Cost:
- Not published for a single drawer. The source whole-bathroom project had a $21,000 budget; price the drawer box, runners, battens and moisture-resistant board locally.
Tools: Tape measure, Spirit level, Stud finder, Drill/driver, Jigsaw or multi-tool, Clamps, Screwdriver, Caulking gun, Utility knife
Materials: Drawer box, Full-extension runners, Timber battens, Moisture-resistant MDF or plywood, Bathroom sealant, Waterproofing membrane and tape, Tile trim
- 01
Choose the location before first fix
Check the waste pipe, water supplies, studs, cables and door swing. Mark the drawer opening on the wall or vanity carcass. Keep the opening out of the shower wet zone unless you can tank and seal it properly.
- 02
Frame the opening
Fix timber battens to the studs or vanity carcass. Use moisture-resistant board. Check the frame is square and level before the drawer box goes anywhere near it.
- 03
Fit the runners
Mount the runners to the carcass or frame. Slide the drawer in and out before tiling. It should clear the tile line, the waste trap and any isolation valves.
- 04
Waterproof and tile around the opening
Tank the opening if it is in a wet zone. Tile up to the frame, seal the cut edges, and keep the opening clear for the drawer box.
- 05
Fit the drawer and adjust
Fix the drawer front, check the pull and the soft-close action, and adjust the runners. Seal any exposed cut edges. Make sure the drawer lifts out for cleaning and access to the trap.
What usually goes wrong
- The opening is cut after tiling, so the tile edges chip and the tanking is breached.
- The drawer box is ordered before the waste trap and isolation valve are measured, and it will not close.
- The runners are cheap and the drawer sags in a damp room.
- The drawer front hits the door, the shower screen or the basin.
- The wall is not checked for cables and pipes before cutting.
- The opening is sealed with decorator's caulk instead of a bathroom sealant or tanking.
Waterproofing is the one mistake that costs real money. A drawer opening in a tiled wall interrupts the tanking. If the wall is in a wet zone, the opening needs a proper seal and the drawer needs to be removable without damaging the membrane. If you are not sure, keep the drawer in the vanity or in a dry wall outside the shower area.
When to call a professional
Moving a soil pipe, cutting a structural stud, or putting a socket or light in a drawer are not DIY jobs in most of Europe. Mains electrical work in a bathroom needs a qualified electrician, and the electrician needs to know the drawer layout before the first fix. A joiner is worth the money for a wall-recessed drawer if the stud bay is awkward or the wall is load-bearing. For the tanking, use a bathroom fitter who will guarantee the wet zone in writing.
Frequently asked questions
- Can I add a hidden drawer without gutting the bathroom?
- Yes, if you use a vanity plinth or a dry wall with enough clearance, but you will still cut and patch tiles. A drawer that needs a new framed opening behind the tile is a gut-job detail.
- Where should hidden drawers go in a small bathroom?
- Under the vanity, beside the basin in a slim bank, or in a dry stud wall. Keep them out of the wet zone unless the opening is tanked and sealed.
- How deep does a hidden drawer need to be?
- Deep enough for the drawer box plus runners and service clearance. Measure the box first. Shallow boxes suit plinths; deeper boxes need a stud bay or vanity carcass.
- Do I need an electrician for a drawer with a socket?
- Yes. A socket or light inside a bathroom drawer is mains electrical work, and in most of Europe it needs a qualified electrician and the right IP rating.
- What did the $21,000 bathroom renovation include?
- The source reports a full gut, removal of tiles covering 75% of the walls, a tub-to-shower swap, white wall tiles and black fittings. The budget is for the whole room, not just storage.
Sources
Next projects
Dollar Tree window privacy DIY: bath mat, PVC and one catch
A clear Dollar Tree bath mat framed in PVC trim hides a shower window without blocking daylight. The build takes an hour; the weekly job is drying the glass behind it.
Basic tool kit for beginners: 8 categories, not 80 items
A basic tool kit for beginners is eight categories and a drill, not 200 pieces. Where to spend, what to save on, and the Pozidriv trap waiting in European flat-pack.
Balcony solar panel: €450 kit, €160 to €720 saved a year
A 400 to 800 W balcony solar panel kit costs about €450 to €1,350 and saves €160 to €720 a year. What the kit includes, where plugging one in is legal, and the sums to run first.